C Transmission Line Project Activity is ramping up at Copper Cove. Mozingo Construction is preparing to begin mainline installation, with a small crew already mobilizing at Tank…
Jenny Lind - Rancho Calaveras A-B Water Transmission Pipeline Project The Project involves construction of a new, dedicated transmission main from the existing Tank A booster pump station to the existing Tank B. The…
Copper Cove B Tank & ClearwellThe Project is located at the Calaveras County Water District’s Copper Cove Water Treatment Plant (WTP) at Kiva Place, and the Copper Cove B Tanks…
West Point Wilseyville Wastewater Treatment Consolidation ProjectCalaveras County Water District owns and operates two wastewater treatment facilities serving the communities of West Point and Wilseyville. The close…
Advanced Metering Infrastructure (AMI) ProjectInstalling AMI meters is an exciting opportunity for the District to provide customers with real time water usage information. During the transition…
Ebbetts Pass Redwood Tank Replacement ProjectCalaveras County Water District’s (CCWD) Redwood tank replacement project is currently underway, and will replace existing redwood tanks located in…
Reach 1 Pipeline Replacement ProjectCCWD is replacing about 5 miles of water transmission pipeline between Avery and Forest Meadows. Construction began on July 8, 2019, and will continue…
Jenny Lind Water Treatment Plant Improvements ProjectThe Calaveras County Water District (District) owns and operates the Jenny Lind Water Treatment Plant (Jenny Lind Plant) near Valley Springs…
Reach 3A Pipeline ReplacementProject MapPowerPoint Presentation from Community MeetingThis project will replace about 20,000 feet of 12-inch diameter…